Answer: One to two hours Explanation: Again , disstance fron location of were mulch is Dump , leather of property to flower beds , 1" of mulch or 3"s of mulch but typically if you are just dumping the mulch and nothing else 4 yards with 2 to 3 guys can be done within 1hr easily if it's a typical blue collar home with a average 3 to 4 bedroom driveway |
| CDE property management LLC |
Answer: Two to four hours Explanation: Typically it is 1 yard per person per hour to spread |
| Southern Comfort Landscaping, LLC |
Answer: Eight to ten hours Explanation: This Also depends on the layout |
| LRM Lawn Service |
|
| ProMatcher |
Answer: Two to four hours Explanation: 2 to 3 hrs depending on situation. |
| INSURED!!!!Tcb Services and property management |
Answer: Two to four hours Explanation: Definitely depends on the landscaping. |
| LLEWELYN LANDSCAPING AND DESIGN, llc |
Answer: Two to four hours Explanation: Again, it does depend on the environment. |
| E&H Maintenance |
|
| ProMatcher |
Answer: One to two hours Explanation: Depending on the property, 4 yards would take roughly 2 hours with wheelbarrows. |
| Brothers In Lawn And More LLC |
Answer: One to two hours Explanation: Depends on how many guys also depending on location of dumping is from installation |
| Texas Green Boys LLC |
Answer: One to two hours Explanation: A good landscaper can spread more than 4 cubic yards in just a couple of hours. |
| Spry Lawn Care |
|
| ProMatcher |
Answer: Two to four hours Explanation: Should take 2 1/2 to 3 hours to complete. |
| Get A Grip LLC |
Answer: Four to six hours Explanation: Spreading 4 cubic yards of mulch by hand would take approximately 4-6 hours for one person to complete.
The reasoning is:
~ 1 cubic yard of mulch covers 100-150 square feet at a 3-4 inch depth.
~ 4 cubic yards will cover 400-600 square feet total.
~ Raking and spreading the mulch smoothly and evenly over this larger area is very time consuming.
~ Factoring in periodic breaks and clean up time, it's reasonable to expect spreading 4 cubic yards of mulch would take a single person about 4-6 hours.
~ Having a second person helping could potentially reduce the time a bit. But mulching is slow, labor intensive work.
~ Proper coverage and depth is essential, so allow plenty of time to spread 4 cubic yards properly.
~ Rushing usually leads to uneven results. A smoothly mulched landscape is worth the time investment.
Plan on 4-6 hours for one person to hand spread 4 cubic yards of mulch properly. Additional help or using tools can speed it up somewhat, but doing the job right still requires time and diligent effort. |
| Floyd's Lawn & Landscape, LLC |
Answer: One to two hours Explanation: We work in good timing |
| Midwest four seasons landscaping |
|
| ProMatcher |
Answer: Four to six hours Explanation: It generally takes 1 person 45 minutes to install 1 cubic yard of mulch. Hourly rates tend to be $40 – $50 per hour per person. So if, for example, you need 8 cubic yards of mulch spread, then it'll probably cost between $240 – $300. Most bagged mulch is sold in 2 cubic foot bags. So, for every 13.5 bags, you need one cubic yard. Example: If you used 54 bags last year, you would get the same amount of mulch in 4 cubic yards. |
| C&R Landscaping |
Answer: One to two hours Explanation: With a Finn Bark blower(302) it wood take 2 hours with clean up. |
| B- Sharp Property Maintenance |
Answer: Two to four hours Explanation: Two to four hours depending on if the area is open or if there are bushes and flowers to mulch around. |
| S&M Landscaping |
|
| ProMatcher |
Answer: One to two hours Explanation: 2 people can typically spread 1 yd of mulch in 15 minutes. |
| Larry Pierce Lawn/Landscaping |
Answer: One to two hours Explanation: Things go quick with a compact tractor. |
| DB Tractor Works |
Answer: Two to four hours Explanation: Two guys could do this in about 2 hours |
| Roop's Lawn Services, LLC |
|
| ProMatcher |
Answer: One to two hours Explanation: Leveling and spreading out blowing out edges everything off foundation and plants excetra. |
| Rick and Rondas Landscapes |
Answer: One to two hours Explanation: Depending on equipment and location on average 1.5 to 2 hours. |
| DG Lawnscaping |
Answer: One to two hours Explanation: Double my previous formula. |
| Englert Landscaping Services, LLC |
|
| ProMatcher |
Answer: One to two hours Explanation: 1 man spreading can knock out about 4 cubic yards per 1.5 hours |
| GLOBAL ADVANTAGE LANDSCAPING SERVICES, LLC |
Answer: Four to six hours Explanation: Depending on the landscape of the area mulch is being laid, if its around a bunch of bushes and trees may take 4 to 5 hours, if just in general wide open areas can take as little as two hours. |
| West Michigan Lawn & Landscape LLC |
Answer: Not sure Explanation: Spreading of mulch can take a wide range of time to complete. Each landscape is different. |