How long does it take to spread 4 cubic yards of mulch?

One to two hours
28%
Two to four hours
36%
Four to six hours
17%
Six to eight hours
7%
Not sure
10%
Get Free Quotes Today!
Question: How long does it take to spread 4 cubic yards of mulch?
Top Answer (36% of 69 votes): Two to four hours.

Answer: Four to six hours
Explanation: It takes about 4 to 6 hours for one person
Rosas lawn service
Answer: One to two hours
Explanation: Depending on the property, 4 yards would take roughly 2 hours with wheelbarrows.
Brothers In Lawn And More LLC
Answer: One to two hours
Explanation: Depends on how many guys also depending on location of dumping is from installation
Texas Green Boys LLC
ProMatcher
Answer: Not sure
Explanation: It will depend on where landscape area is and how many guys we are able to put on job.
Special T Lawncare
Answer: Two to four hours
Explanation: Should take 2 1/2 to 3 hours to complete.
Get A Grip LLC
Answer: Four to six hours
Explanation: Spreading 4 cubic yards of mulch by hand would take approximately 4-6 hours for one person to complete. The reasoning is: ~ 1 cubic yard of mulch covers 100-150 square feet at a 3-4 inch depth. ~ 4 cubic yards will cover 400-600 square feet total. ~ Raking and spreading the mulch smoothly and evenly over this larger area is very time consuming. ~ Factoring in periodic breaks and clean up time, it's reasonable to expect spreading 4 cubic yards of mulch would take a single person about 4-6 hours. ~ Having a second person helping could potentially reduce the time a bit. But mulching is slow, labor intensive work. ~ Proper coverage and depth is essential, so allow plenty of time to spread 4 cubic yards properly. ~ Rushing usually leads to uneven results. A smoothly mulched landscape is worth the time investment. Plan on 4-6 hours for one person to hand spread 4 cubic yards of mulch properly. Additional help or using tools can speed it up somewhat, but doing the job right still requires time and diligent effort.
Floyd's Lawn & Landscape, LLC
ProMatcher
Answer: Not sure
Explanation: We do not spread
WJ TRUCKING & CONSTRUCTION SERVICES
Answer: Four to six hours
Explanation: It generally takes 1 person 45 minutes to install 1 cubic yard of mulch. Hourly rates tend to be $40 – $50 per hour per person. So if, for example, you need 8 cubic yards of mulch spread, then it'll probably cost between $240 – $300. Most bagged mulch is sold in 2 cubic foot bags. So, for every 13.5 bags, you need one cubic yard. Example: If you used 54 bags last year, you would get the same amount of mulch in 4 cubic yards.
C&R Landscaping
Answer: One to two hours
Explanation: With a Finn Bark blower(302) it wood take 2 hours with clean up.
B- Sharp Property Maintenance
ProMatcher
Answer: Two to four hours
Explanation: As explained in my previous answer it should take about 1 1/2 hour for 2 cubic yards so double that and you have 3 hours. 4 cubic yards = 36, 3 cubic foot bags of mulch 5 minutes for every bag 36 bags X 5 Minutes = 180 minutes = 3 hours
Green Top Lawn Care
Answer: One to two hours
Explanation: 2 people can typically spread 1 yd of mulch in 15 minutes.
Larry Pierce Lawn/Landscaping
Answer: One to two hours
Explanation: Things go quick with a compact tractor.
DB Tractor Works
ProMatcher
Answer: Two to four hours
Explanation: We are able to spread 4 cubic yards of mulch using a crew and proper mulch laying and spreading equipment.
Clean Up LLC - Landscaping & Lawn Care Service
Answer: One to two hours
Explanation: Leveling and spreading out blowing out edges everything off foundation and plants excetra.
Rick and Rondas Landscapes
Answer: One to two hours
Explanation: Depending on equipment and location on average 1.5 to 2 hours.
DG Lawnscaping
ProMatcher
Answer: Six to eight hours
Explanation: Also depends on the area
Pioneer Seasonal Services
Answer: One to two hours
Explanation: 1 man spreading can knock out about 4 cubic yards per 1.5 hours
GLOBAL ADVANTAGE LANDSCAPING SERVICES, LLC
Answer: Four to six hours
Explanation: Depending on the landscape of the area mulch is being laid, if its around a bunch of bushes and trees may take 4 to 5 hours, if just in general wide open areas can take as little as two hours.
West Michigan Lawn & Landscape LLC
ProMatcher
Get Free Quotes Today!
Find Local Pros
Free Wood Mulch Delivery Cost Estimates

Related Questions

How Much Does Mulch Spreading Cost?

On average, how thick should mulch be spread?Top answer: 1-2 inches

Is it necessary to water mulch after it has been spread?Top answer: No, mulch does not need to be watered.

Which lasts longer, shredded bark mulch or chip bark mulch?Top answer: Chip bark mulch will last longer

Is it necessary to lay a landscape fabric under organic mulch?Top answer: Yes



Free Cost Estimates   |   Mulching Service Directory   |   Mulch Cost Report   |   Free Business Listing



All users of ProMatcher.com are subject to our terms of use.

Home   |   Articles & Videos   |   Affiliates   |   Networking Groups   |   Search by Category

Terms of Use   |   Privacy   |   Partner Network   |   Your Privacy Choices   |   About Us   |   Contact Us   |   Member Login

©2003-2024 - VentureStreet, LLC

Join Our Business Network